top of page

Search


The Excavation Was Already Failing
A 20-year-old engineering student suffered serious spinal injuries after unstable ground gave way beneath her at the edge of a three-metre excavation. The excavation was already showing signs of failure, yet work continued without battering, fencing or effective edge protection.

Safety Jon
Aug 136 min read
bottom of page